Showcasing Our Engineering Projects

University of Texas at El Paso
AEG had the privilege of designing a new 1,600 SF. Animal Lab in 2013 for the University of Texas at El Paso Biology building.

Del Sol Medical Hospital Stereotaxis cath lab
This is the first stereo taxis cath lab in El Paso installed in 2010.

Helen Ball Elementary HVAC Upgrades
The 100,000 Square foot Helen Ball Elementary school underwent a complete HVAC Upgrade back in 2012.

University of Texas at El Paso
AEG had the privilege of designing a new 1,600 SF. Animal Lab in 2013 for the University of Texas at El Paso Biology building.

Mentis Neuro Rehab Center
This new 50,000 Neurorehab center was design with multiple ultra-high efficiency roof top units with variable

Hospital of Providence Sierra Campus
The new Hybric cath at the Sierra campus is the first of its kind in el Paso. The project was completed in 2015. AEG design the heating 

Socorro Middle School HVAC Upgrades
The 110,000 square foot Socorro Middle School underwent a complete HVAC upgrade, along with a complete reroofing,

Soldier and Family health Clinic
The existing 52,000 square foot health clinic underwent a complete 7.8 million dollar renovation. 

University Medical Center Annex Building
AEG was tasked in 2012 to complete redesign the 4 four story 50,000 SF building.